Project for the construction of units under license
1- Construction of hydrogen purification units and light naphtha isomyration with a capacity of 7,500 barrels per day (1500 units)
2- Construction of hydrogen purification units and catalytic conversion of heavy naphtha with a capacity of 6800 bbl / day (1,300 units)
3- Construction of a hydrogen purification unit for the distillation of oil and gas oil with a capacity of 17,800 bpd (1600 units)
4. Construction of a sulfur recovery unit with a capacity of 30 tons per day (1700 units)
5- Modifications to the hydrogenation unit and the existing catalytic conversion (300 units)
.jpg)
Completed units of the project for the construction of units under license
1- Hydrogen purification unit and catalytic conversion of heavy naphtha (1300)
2- Unit of Unifiner Hydrogen Purification Unit and Light Naphtha Isomization (1500)
3. Construction of a hydrogen purification unit for the distillation of petroleum and petroleum products (unit 1600)
4- Anbar Administrative Building and Subsidiary Electricity Subsidiary Unit (Unit 8300)
5. Revamping the existing catalyst unit (Unit 300)